CABVIX FOR ELECTRICAL & CABLING INSTALLERS

Terminate the job.
Build the record.

Keep outlets, patch-panel ports, equipment, labels and test-ready handover information aligned while the installation is still in progress.

Electrical and cabling installers reviewing a completed rack with CABVIX
A verified path from outlet to rack.

FROM CABLE PULL TO HANDOVER

Keep the schedule aligned
with the installation.

01

Map as work progresses

Assign outlet sockets, patch-panel ports and destinations without waiting to rebuild the schedule later.

02

Resolve gaps on site

Identify missing labels, mismatched numbering and occupied ports while the crew can still correct them.

03

Present a cleaner handover

Provide rack, equipment, connection and outlet records that support approval and future maintenance.

A FIELD-FIRST WORKFLOW

Install. Verify. Hand over.

01

Lay out the rack

Place cabinets, patch panels, switches, fibre trays, shelves and installed hardware.

02

Assign outlets

Map individual sockets to the correct patch-panel positions, including non-consecutive ports.

03

Patch and label

Record switch ports, PoE, lead colours, tags and paths through the Patch Wizard.

04

Issue the record

Prepare branded rack and installation records for supervisors, clients and maintenance teams.

WHERE IT FITS

From new builds
to remediation.

ADMINISTRATION MATTERS

Labels need a record behind them.

Telecommunications administration standards recognise consistent identification and records as part of managing cabling infrastructure. CABVIX supports documentation and handover; qualified installers remain responsible for testing, certification and regulatory compliance.

DOCUMENT THE JOB WHILE IT IS IN FRONT OF YOU

Every outlet. Every port. Every handover.

Join early access